EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (676)
Research
Workshop
- (4)
Empennage
- (37)
-
Vertical Stab and...
-
Vertical Stab
-
Horizontal and...
-
Horizontal Stab fairing
-
Elevator
-
Elevator
-
Elevator
-
Elevator
-
Elevator
-
Elevator
-
Elevator
-
Elevator
-
Elevator
-
Elevator
-
Elevator
-
Elevator
-
Horizontal Stabilizer
-
Horizontal Stabilizer
-
Horizontal Stabilizer
-
Horizontal Stabilizer
-
Horizontal Stabilizer
-
Horizontal Stabilizer
-
Horizontal Stabilizer
-
Horizontal Stabilizer
-
Horizontal Stabilizer
-
Horizontal Stabilizer
-
Horizontal Stabilizer
-
Horizontal Stabilizer
-
Vertical Stab Top...
-
Vertical Stab Top...
-
Vertical Stab and...
-
Vertical Stab
-
Vertical Stab
-
Vertical Stab
-
Vertical Stab
-
Vertical Stab
-
Rudder Build
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (3)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (50)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1988
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Apr 30, 2021
Horizontal Stabilizer
- (5.6 hours)
Category: Empennage
Riveted Ribs and nose ribs to front and rear spar, dimpled skins in center section and countersunk front spar on top and bottom flange in center section.
Riveted all ribs to spars, dimpled skins and countersunk spars 30 April 2021 (1).jpg
Riveted all ribs to spars, dimpled skins and countersunk spars 30 April 2021 (2).jpg
Riveted all ribs to spars, dimpled skins and countersunk spars 30 April 2021 (3).jpg
Riveted all ribs to spars, dimpled skins and countersunk spars 30 April 2021 (4).jpg
Riveted all ribs to spars, dimpled skins and countersunk spars 30 April 2021 (5).jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.